The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77

The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77
Author :
Publisher :
Total Pages : 0
Release :
ISBN-10 : OCLC:45522688
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77 by :

Download or read book The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77 written by and published by . This book was released on 1998 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R & D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R & D funding level for these ships.


The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77 Related Books

The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77
Language: en
Pages: 0
Authors:
Categories:
Type: BOOK - Published: 1998 - Publisher:

GET EBOOK

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carri
The U.S. Aircraft Carrier Industrial Base Force Structure, Cost, Schedule, and Technology Issues for CVN 77
Language: en
Pages: 193
Authors: John Birkler
Categories:
Type: BOOK - Published: 1998 - Publisher:

GET EBOOK

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carri
A Methodology for Estimating the Effect of Aircraft Carrier Operational Cycles on the Maintenance Industrial Base
Language: en
Pages: 106
Authors: Roland J. Yardley
Categories: Political Science
Type: BOOK - Published: 2007 - Publisher: Rand Corporation

GET EBOOK

The Fleet Response Plan is a U.S. Navy program to enhance the operational availability of the aircraft carrier fleet. This report describes program modeling tha
Differences Between Military and Commercial Shipbuilding
Language: en
Pages: 140
Authors:
Categories: Business & Economics
Type: BOOK - Published: 2005 - Publisher: Rand Corporation

GET EBOOK

This monograph is one of a set of three addressing related issues in UK shipbuilding. Funded by the Defence Procurement Agency (DPA), the three studies have the
Increasing Aircraft Carrier Forward Presence
Language: en
Pages: 91
Authors: Roland J. Yardley
Categories: History
Type: BOOK - Published: 2008 - Publisher: Rand Corporation

GET EBOOK

The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the d