SL-1 ANNUAL OPERATING REPORT, FEBRUARY 1960-JANUARY 3, 1961
Author | : |
Publisher | : |
Total Pages | : |
Release | : 1961 |
ISBN-10 | : OCLC:727223431 |
ISBN-13 | : |
Rating | : 4/5 ( Downloads) |
Download or read book SL-1 ANNUAL OPERATING REPORT, FEBRUARY 1960-JANUARY 3, 1961 written by and published by . This book was released on 1961 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The plant was operated from Feb. l959 until Jan. 3, 1961 when a nuclear excursion rendered the plant inoperable, A summary of operations is presented for the period Feb. 1960 until the incident. Plant operational tinwe during the period was 78% of that available. Satisfactory operation of conventional plant equipment was observed during 196 startups and scrams. An inspection of fuel assemblies after 700 Mwd showed no damage except to the B-Al strips attached to these assemblies. A greater than predieted gain in core reactivity was attributed to boron loss. Control rod sticking occurred 53 times ln 2,730 cases of operation. Test results on a PL-type condenser showed that its performance meets design rating. Steam quality remained greater than 99% for power levels up to 4.7 Mw(t) and radiation in the main steam system continued to be satisfactorily low. Waste handling requirements were increased but posed no problem. (J.R.D.).