Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996

Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996
Author :
Publisher :
Total Pages : 18
Release :
ISBN-10 : OCLC:68414478
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996 by :

Download or read book Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996 written by and published by . This book was released on 1996 with total page 18 pages. Available in PDF, EPUB and Kindle. Book excerpt: At this stage, the main emphasis is on the Field Demonstration phase of the project. The drilling portion of the Field Demonstration has been divided into two separate phases. We are currently proceeding with the drilling and completion of the first eleven Phase I wells. Locations for the additional seven Phase III wells were chosen at a Technical Committee meeting during the first week of June. Preliminary results have been very encouraging as all the wells are producing at or above their forecasted rates. Phase I includes the drilling of four producers and one injection well (10-acre nominal spacing) in both the Section 329 study area and the Section 326/327 study area, as well as one producing well in Section 362. Phase I will be completed during the first week of July. Phase II drilling will involve the completion of the waterflood patterns to the west of the Phase I areas in Sections 329 and 327, consisting of two producers and one injection well in each area. The final Phase II well will be located near the southwest corner of Section 324, in an area of the Unit that remains relatively undrained. Producer-injection well conversions will be performed in this area, as well as other peripheral areas of the Unit to add needed water injection.


Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996 Related Books

Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996
Language: en
Pages: 18
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

GET EBOOK

At this stage, the main emphasis is on the Field Demonstration phase of the project. The drilling portion of the Field Demonstration has been divided into two s
ספר תקני 9000 ISO
Language: en
Pages:
Authors:
Categories: Manufactures
Type: BOOK - Published: 1995 - Publisher:

GET EBOOK

Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, December 13, 1995--March 12, 1996
Language: en
Pages: 9
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

GET EBOOK

This project has used a multi-disciplinary approach employing geology, geophysics, and engineering to conduct advanced reservoir characterization and management
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, September 13--December 12, 1996
Language: en
Pages: 15
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

GET EBOOK

Eighteen 10-acre infill wells have been drilled and completed as part of the Field Demonstration phase of the project at the North Robertson (Clearfork) Unit (N
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Annual Technical Progress Report, June 13, 1996--June 12, 1997
Language: en
Pages: 16
Authors:
Categories:
Type: BOOK - Published: 1997 - Publisher:

GET EBOOK

Infill drilling of wells on a uniform spacing, without regard to reservoir performance and characterization, does not optimize reservoir development because it