Integrated Cost-Schedule Risk Analysis

Integrated Cost-Schedule Risk Analysis
Author :
Publisher : Gower Publishing, Ltd.
Total Pages : 241
Release :
ISBN-10 : 9781409459101
ISBN-13 : 1409459101
Rating : 4/5 (101 Downloads)

Book Synopsis Integrated Cost-Schedule Risk Analysis by : Dr David Hulett

Download or read book Integrated Cost-Schedule Risk Analysis written by Dr David Hulett and published by Gower Publishing, Ltd.. This book was released on 2012-09-28 with total page 241 pages. Available in PDF, EPUB and Kindle. Book excerpt: Project managers tend to believe their cost estimates - whether they have exceeded budgets in the past or not. It is dangerous to accept the engineering cost estimates, which are often optimistic or unrealistic. Though cost estimates incorporate contingency reserves below-the-line, these estimates of reserves often do not benefit from a rigorous assessment of risk to project costs. Risks to cost come from multiple sources including uncertain project duration, which is often ignored in cost risk analyses. In short, experience shows that cost estimating on projects is rarely successful - cost overruns routinely occur. There are effective ways to estimate the impact on the cost of complex projects from project risks of all types, including traditional cost-type risks and the indirect but often substantial impact from risks usually thought of as affecting project schedules. Integrated cost-schedule risk anlaysis helps us determine how likely the project will go over budget with the current plan, how much contingency reserve is required to achieve a desired level of certainty, and which risks are most important so the project manager can mitigate them and achieve a better result. Integrated Cost-Schedule Risk Analysis provides solutions for these and other challenges. This book follows on from David Hulett's highly-praised Practical Schedule Risk Analysis. It focuses on the way that schedule risk can generate cost risk, and how to handle this relationship. It also applies the Risk Driver Method to the analysis so that you can clearly and transparently identify the key risks, rather than just the most risky cost line items. With detailed worked examples and over 70 illustrations, Integrated Cost-Schedule Risk Analysis offers the definitive guide to this critically important aspect of project management from surely the world's leading commentator.


Integrated Cost-Schedule Risk Analysis Related Books

Integrated Cost-Schedule Risk Analysis
Language: en
Pages: 239
Authors: David Hulett
Categories: Business & Economics
Type: BOOK - Published: 2016-05-23 - Publisher: CRC Press

GET EBOOK

Project managers tend to believe their cost estimates - whether they have exceeded budgets in the past or not. It is dangerous to accept the engineering cost es
Practical Schedule Risk Analysis
Language: en
Pages: 238
Authors: David Hulett
Categories: Business & Economics
Type: BOOK - Published: 2016-04-08 - Publisher: CRC Press

GET EBOOK

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will
Project Risk Quantification
Language: en
Pages: 416
Authors: John K. Hollmann
Categories:
Type: BOOK - Published: 2016-06-28 - Publisher:

GET EBOOK

Project Risk Quantification presents the most practical, realistic, and integrated approach to project cost and schedule Risk Quantification that is available t
Project Management with Dynamic Scheduling
Language: en
Pages: 321
Authors: Mario Vanhoucke
Categories: Business & Economics
Type: BOOK - Published: 2013-11-29 - Publisher: Springer Science & Business Media

GET EBOOK

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a base
Risk Management for Design and Construction
Language: en
Pages: 288
Authors: Ovidiu Cretu
Categories: Technology & Engineering
Type: BOOK - Published: 2011-05-04 - Publisher: John Wiley & Sons

GET EBOOK

The essential risk assessment guide for civil engineering, design, and construction Risk management allows construction professionals to identify the risks inhe